Split Linear Bearing Replacement

Previous topic Next topic Topic directory requires JavaScript JavaScript is required for expanding text JavaScript is required for the print function  

NOTE: This topic only applies to Machine 180

 


 

The Overhead Carton Loader assembly shafts use a non-lubricated split linear bearing manufactured by Igus, Inc.

 

 

First, a few precautions and notes:

 

For ease access, the Overhead Carton Loader assembly should be lifted into the changeover position
Follow Lockout/Tagout procedures
There are four split bearings inside each bearing enclosure
o Do not break or tear o-rings when removing bearings
oIt is recommended that all four bearings be replaced at the same time
Work will need to be done on both sides of the machine

 


 

Follow these steps to remove and replace the failed bearing:

 

1)Raise the Overhead Carton Loader assembly into the changeover position
2)Following the first part of the changeover routine, remove all loader plates
3)Follow the Lockout/Tagout procedures of your facility
4)On the non-operator side of the machine, slide the load gate air cylinder toward operator side of the machine

 

 

5)Manually rotate the Overhead Carton Loader to make the non-operator side end cap accessible

 

 

6)To make the operator side end cap accessible, remove the upstream containment rail by removing the four 7/16" bolts

 

 

7)Remove screws and end caps
8)Carefully pull out split bearings

 

Do not scratch the coated surface of the shaft

Do not break or tear o-rings when removing bearings

 

a)Replacing o-rings requires opening both drive chains and removing the containment assembly from the Overhead Carton Loader
b)If necessary, gently pull on the exposed bearing end with channel locks
9)Slip off o-rings
10)Remove and replace split bearing and clearance gasket
11)Slip on o-ring
12)Move bearing with o-rings into position
a)It may be helpful to apply a very small amount of grease on the o-rings to slide the replacement bearing into position

 

These split linear bearings are lubricant free; do not apply any grease to the bearing itself

 

13)Reinstall end caps
14)Reinstall upstream containment rail
15)Move the next loader carriage into position
16)Repeat previous steps for each four bearings in each of the 11 loader carriages
17)Install correct loader plates
18)Restore Lockout/Tagout
19)Lower Overhead Carton Loader into the run position