Aagard Machine Manual

Bearing and Shaft Replacement

Hide Navigation Pane

Bearing and Shaft Replacement

Previous topic Next topic No directory for this topic No expanding text in this topic  

Bearing and Shaft Replacement

Previous topic Next topic Topic directory requires JavaScript JavaScript is required for expanding text JavaScript is required for the print function  

Tools Required:

 

Standard Wrench Set
Standard Allen Pack

 

Routine:

 

1)Remove the drive belt or chain
2)Loosen the set screws on the bearing
3)Remove sprocket or pulley off shaft
4)Take bearings off of mounts and slide off the shaft
5)Remove the bearing plate
6)If bearings are pressed in, press out the bearings which need to be replaced
7)Place the new bearings in the plate
8)Place the plate back in machine
9)Place the new bearings on the ends of the shaft and put the hardware in the mount but do not tighten
10)Make sure shaft is square
11)Tighten the bearings down
12)Tap on the shaft to set the bearings (make sure the inner race spins freely on the shaft)
13)Tighten the set screws on the bearing
14)Place the drive belt or chains back in